The Siderca harbor Crane (Argentina), which has 2 drums, allows the raw materials to be unloaded from the ships in order to supply the Reducción Directa factory, which is specialized in pipes manufacturing.
The factory has two original drums. The first was operational and the second, which we had to repair due to wear, was used as a spare (today, it is also in operation).
The repair of the 4 winding zones was only carried out once the drum was in the Siderca workshops. During assembly, it turned out that due to the wear of the rolling surfaces, the spare part had to be “standardized”.
Due to lack of time and available staff, because of an overload of work, Siderca had to decline the offer. After several consultations to find a company able to carry out this job, Siderca suggested to consult with Welding Alloys.
The Siderca maintenance team contacted our sales representative, Mr. Eduardo Chain, to evaluate the feasibility of the project. We then went on site to assess the part. Back at the workshop with various information (drawings, photos, etc), we decided together with our production department that we would be able to carry out this project, thanks to our tubular welding wires!
The drum was very bulky: 7,727.95 mm long, 40 “Ø and a weight of 11,488 tons.
The preparation and machining were done by Siderca; then, we carried out the welding as well as the heat treatment.